|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Feature: | Anti-Bacterial, Anti-Pull, Anti-Static, Anti-Tear, Breathable, Eco-Friendly, Mothproof, Waterproof |
| Pattern: | Plain |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
We have introduced the latest non-woven RF5 production line from European, equipped with SSMMMS 6 device. Used for the development and production of functional non-woven fabrics in the fields of medical, sanitation, environmental protection, industry, construction and other fields. it will be able to produce 20,000 tons of high-performance industrial non-woven fabrics annually.


| Non-woven technical data | ||||||||
| Basic weight g/m2 |
Air permeability L/m2/s |
Hydro head mm |
MD Tensile strength N/5CM |
CD Tensile strength N/5CM |
MD Elongation % |
CD Elongation % |
Structure | Performance |
| 8 | 3678.00 | 79.20 | 21.26 | 6.41 | 43.62 | 76.29 | SSMMMS | Hydro phobic |
| 10 | 2155.33 | 131.93 | 28.64 | 9.58 | 69.50 | 75.84 | SSMMMS | Hydro phobic |
| 12 | 6179.33 | / | 37.61 | 17.04 | 79.82 | 85.25 | S²S²S² | Hydro phobic |
| 13 | 1720.67 | 143.60 | 35.20 | 12.80 | 53.90 | 69.56 | SSMMMS | Hydro phobic |
| 45 | 245.73 | 1124.60 | 100.26 | 49.80 | 59.47 | 55.06 | SSMMMS | Hydro phobic |
It is versatile and can meet the needs of a variety of products. Able to widely screen the health industry/medical industry/agricultural industry, etc., our products are designed to make your life easier and more convenient.
Rival Quality Control Department focuses on every production process quality control and recording so that there will be no defects in the delivery of each order. Sampling is conducted every 3 hours from production beginning, middle and end to make sure 100% meet customer requirements.


